REFERENCES

  Application Project delivered
  2006  
  Baumax Cluj Napoca Prefabricated substation in concrete enclosure BK54-23 2x400kVA
  DNA Bucharest head office Prefabricated substation in concrete enclosure BK002 250kVA
  Comtim farms, Timisoara 30 Prefabricated substation in concrete enclosure BK001 100kVA
  Passage to 20kV Timisoara, Arad Prefabricated substations in concrete enclosure, ES 01 medium voltage cubicles
  Civic centre Bucharest Prefabricated substation in metal enclosure SIK 85-23 2x1600kVA
  Urbis Baia Mare, trolley bus Station cubicle unit